TIME AND WORK EXAMPLE QUESTIONS PART 1


TIME AND WORK EXAMPLE QUESTIONS PART 1

1. A can do a work in 15 days and B in 20 days. If they work on it together for 4 days, then the fraction of the work that is left is :

A.1/4

 

B.1/10

 

C.7/15

 

D. 8/15

 

Answer: Option D

Explanation:

 

A's 1 day's work =            1/15       ;

                             

B's 1 day's work =            1/20       ;

                             

(A + B)'s 1 day's work =  (1/15    +1/20)   =7/60    .

                                            

(A + B)'s 4 day's work =  (7/60    x 4)         =7/15   .

                                            

Therefore, Remaining work =      (1 - 7/15)=8/15 .

                                                           

 

 

 

2.  A can lay railway track between two given stations in 16 days and B can do the same job in 12 days. With help of C, they did the job in 4 days only. Then, C alone can do the job in:

A. 9        1/5         days

                             

B. 9        2/5         days

                             

C. 9        3/5         days

                             

D. 10

 

Answer: Option C

Explanation:

 

(A + B + C)'s 1 day's work =           1/4         ,

                             

A's 1 day's work =            1/16       ,

                             

B's 1 day's work =            1/12       .

                             

  C's 1 day's work =          1/4   -   (1/16      +             1/12)     =             (1/4       -   7/48) =  5/48  .

                                                                                         

So, C alone can do the work in    48/5       = 9          3/5         days.

                             

 

 

 

3.  A, B and C can do a piece of work in 20, 30 and 60 days respectively. In how many days can A do the work if he is assisted by B and C on every third day?

A. 12 days

B. 15 days

C. 16 days

D. 18 days

 

Answer: Option B

Explanation:

 

A's 2 day's work =                          1/20       x 2          =            1/10       .

                                            

(A + B + C)'s 1 day's work =1/20  +1/30    +             1/60                     =             6/60       =               1/10       .

                                                           

Work done in 3 days =    1/10      +1/10    =1/5      .

                                            

Now,     1             work is done in 3 days.

               5            

  Whole work will be done in (3 x 5) = 15 days.

 

 

4.  A is thrice as good as workman as B and therefore is able to finish a job in 60 days less than B. Working together, they can do it in:

A. 20 days

 

B. 22      1/2         days

              

C. 25 days

 

D. 30 days

 

Answer: Option B

Explanation:

 

Ratio of times taken by A and B = 1 : 3.

The time difference is (3 - 1) 2 days while B take 3 days and A takes 1 day.

If difference of time is 2 days, B takes 3 days.

If difference of time is 60 days, B takes                 3/2   x 60                           = 90 days.

                             

So, A takes 30 days to do the work.

A's 1 day's work =            1/30

              

B's 1 day's work =            1/90

              

(A + B)'s 1 day's work =                1/30       +             1/90                     =             4/90       =               2/45

                             

  A and B together can do the work in      45/2       = 22  1/2              days.

                             

 

5.  A alone can do a piece of work in 6 days and B alone in 8 days. A and B undertook to do it for Rs. 3200. With the help of C, they completed the work in 3 days. How much is to be paid to C?

A. Rs. 375

 

B. Rs. 400

 

C. Rs. 600

 

D. Rs. 800

 

Answer: Option B

Explanation:

 

C's 1 day's work =            1/3 -  1/6             +  1/8    =            1/3  -  7/24          =   1/24 .

                                                                          

A's wages : B's wages : C's wages =           1/6         :              1/8         :              1/24       = 4 : 3 : 1.

                             

 C's share (for 3 days) = Rs.          (3 x       1/24       x 3200)                = Rs. 400.

                                                                                         

 

 

 

6.  If 6 men and 8 boys can do a piece of work in 10 days while 26 men and 48 boys can do the same in 2 days, the time taken by 15 men and 20 boys in doing the same type of work will be:

A. 4 days

 

B. 5 days

 

C. 6 days

 

D. 7 days

 

Answer: Option A

Explanation:

 

Let 1 man's 1 day's work = x and 1 boy's 1 day's work = y.

Then, 6x + 8y =   1/10    and 26x + 48y =  1/2         .

                                                           

Solving these two equations, we get : x =              1/100    and y =  1/200.

                             

(15 men + 20 boy)'s 1 day's work =                         15/100  +             20/200                =             1/4               .

                                            

  15 men and 20 boys can do the work in 4 days.

 

7. A can do a piece of work in 4 hours; B and C together can do it in 3 hours, while A and C together can do it in 2 hours. How long will B alone take to do it?

A. 8 hours

 

B. 10 hours

 

C. 12 hours

 

D. 24 hours

 

Answer: Option C

Explanation:

 

A's 1 hour's work =          1/4         ;

                             

(B + C)'s 1 hour's work = 1/3         ;

              

(A + C)'s 1 hour's work = 1/2         .

                             

(A + B + C)'s 1 hour's work =                      (1/4        +             1/3)       =             7/12       .

                                            

B's 1 hour's work =                        (7/12     -    1/2)                =             1/12       .

                             

  B alone will take 12 hours to do the work.

 

 

8. A can do a certain work in the same time in which B and C together can do it. If A and B together could do it in 10 days and C alone in 50 days, then B alone could do it in:

A. 15 days

 

B. 20 days

 

C. 25 days

 

D. 30 days

 

Answer: Option C

Explanation:

 

(A + B)'s 1 day's work =  1/10

              

C's 1 day's work =            1/50

              

(A + B + C)'s 1 day's work =           1/10      +   1/50 =      6/50            =             3/25       . .... (i)

                                            

A's 1 day's work = (B + C)'s 1 day's work .... (ii)

From (i) and (ii), we get: 2 x (A's 1 day's work) =  3/25

              

  A's 1 day's work =          3/50       .

                             

  B's 1 day's work              (1/10    -     3/50               )             =             2/50       =             1/25       .

                                            

So, B alone could do the work in 25 days.

 

 

9.  A does 80% of a work in 20 days. He then calls in B and they together finish the remaining work in 3 days. How long B alone would take to do the whole work?

A. 23 days

 

B. 37 days

 

C. 37 1/2 days

 

D. 40 days

 

Answer: Option C

Explanation:

 

Whole work is done by A in         20 x      5/4         = 25 days.

                                                                          

Now,     1 -         4/5         i.e.,       1/5         work is done by A and B in 3 days.

                                                           

Whole work will be done by A and B in (3 x 5) = 15 days.

A's 1 day's work =            1/25       , (A + B)'s 1 day's work = 1/15       .

                             

  B's 1 day's work =          ( 1/15    -    1/25 )              =             4/150    =             2/75       .

                                            

So, B alone would do the work in              75/2       = 37    1/2  days.

                             

 

 10.  A machine P can print one lakh books in 8 hours, machine Q can print the same number of books in 10 hours while machine R can print them in 12 hours. All the machines are started at 9 A.M. while machine P is closed at 11 A.M. and the remaining two machines complete work. Approximately at what time will the work (to print one lakh books) be finished ?

A. 11:30 A.M.

 

B. 12 noon

 

C. 12:30 P.M.

 

D. 1:00 P.M.

 

Answer: Option D

Explanation:

 

(P + Q + R)'s 1 hour's work =        (1/8       +             1/10       +             1/12)                   =               37/120  .

                                            

Work done by P, Q and R in 2 hours =      (37/120               x 2)         =    37/60             .

                                            

Remaining work =                          (1 -   37/60)     = 23/60    .

                                                           

(Q + R)'s 1 hour's work =               1/10      +             1/12       =      11/60          .

                                            

Now,     11/60    work is done by Q and R in 1 hour.

                             

So,         23/60    work will be done by Q and R in 60/11   x             23/60    =           23/11               hours      approx. 2 hours.

                                                                          

So, the work will be finished approximately 2 hours after 11 A.M., i.e., around 1 P.M.

 

 

11. A can finish a work in 18 days and B can do the same work in 15 days. B worked for 10 days and left the job. In how many days, A alone can finish the remaining work?

A. 5

 

B. 5  1/2

              

C. 6

 

D. 8

 

Answer: Option C

Explanation:

 

B's 10 day's work =          (1/15    x 10)      =  2/3    .

                                                                                                        

Remaining work =            (1 -   2/3)     =     1/3        .

                                                           

Now,     1/18       work is done by A in 1 day.

                             

               1/3         work is done by A in                      18 x       1/3         = 6 days.

                                            

 

 

 

12.  4 men and 6 women can complete a work in 8 days, while 3 men and 7 women can complete it in 10 days. In how many days will 10 women complete it?

A. 35

 

B. 40

 

C. 45

 

D. 50

 

Answer: Option B

Explanation:

 

Let 1 man's 1 day's work = x and 1 woman's 1 day's work = y.

Then, 4x + 6y =  1/8         and 3x + 7y =  1/10          .

                             

Solving the two equations, we get: x =    11/400  , y =        1/400

              

  1 woman's 1 day's work =          1/400    .

                             

  10 women's 1 day's work =        1/400   x 10        =   1/40               .

                                            

Hence, 10 women will complete the work in 40 days.

 

 

13.  A and B can together finish a work 30 days. They worked together for 20 days and then B left. After another 20 days, A finished the remaining work. In how many days A alone can finish the work?

A. 40

 

B. 50

 

C. 54

 

D. 60

 

Answer: Option D

Explanation:

 

(A + B)'s 20 day's work =               (1/30    x 20)      =  2/3   .

                                            

Remaining work =            (1 -  2/3)             =    1/3  .

                                                           

Now,     1/3         work is done by A in 20 days.

                             

Therefore, the whole work will be done by A in (20 x 3) = 60 days.

 

 

 14.  P can complete a work in 12 days working 8 hours a day. Q can complete the same work in 8 days working 10 hours a day. If both P and Q work together, working 8 hours a day, in how many days can they complete the work?

A. 5   5/11

              

 

B. 5   6/11

              

 

C. 6   5/11

 

 

D. 6   6/11

              

 

Answer: Option A

Explanation:

 

P can complete the work in (12 x 8) hrs. = 96 hrs.

Q can complete the work in (8 x 10) hrs. = 80 hrs.

  P's1 hour's work =         1/96       and Q's 1 hour's work = 1/80       .

                             

(P + Q)'s 1 hour's work =               1/96      +             1/80       =   11/480           .

                                            

So, both P and Q will finish the work in   480/11 hrs.

                                                           

  Number of days of 8 hours each =          (480/11               x             1/8)        =      60/11    days = 5    5/11               days.

                                            

 

 

 

15.  10 women can complete a work in 7 days and 10 children take 14 days to complete the work. How many days will 5 women and 10 children take to complete the work?

A. 3

 

B. 5

 

C. 7

 

D. Cannot be determined

 

E. None of these

 

Answer: Option C

Explanation:

 

1 woman's 1 day's work =            1/70

              

1 child's 1 day's work =  1/140

              

(5 women + 10 children)'s day's work =   (5/70    +  10/140)     =           (1/14            +   1/14)               =   1/7

                             

  5 women and 10 children will complete the work in 7 days.

 

 

16.  X and Y can do a piece of work in 20 days and 12 days respectively. X started the work alone and then after 4 days Y joined him till the completion of the work. How long did the work last?

A. 6 days

 

B. 10 days

 

C. 15 days

 

D. 20 days

 

Answer: Option B

Explanation:

 

Work done by X in 4 days =          (1/20    x 4)         =      1/5 .

                                            

Remaining work =            (1 -  1/5)                  =      4/5          .

                                                           

(X + Y)'s 1 day's work =            (1/20    +    1/12)     =     8/60    =    2/15          .

                                            

Now,     2/15       work is done by X and Y in 1 day.

                             

So,         4/5         work will be done by X and Y in        15/2    x   4/5               = 6 days.

                                            

Hence, total time taken = (6 + 4) days = 10 days.

 

 

17.  A is 30% more efficient than B. How much time will they, working together, take to complete a job which A alone could have done in 23 days?

A. 11 days

 

B. 13 days

 

C. 20      3/17       days

                             

D. None of these

 

Answer: Option B

Explanation:

 

Ratio of times taken by A and B = 100 : 130 = 10 : 13.

Suppose B takes x days to do the work.

Then, 10 : 13 :: 23 : x         

 x =    (23 x 13) /10                  

  x =        299/10  .

                                            

A's 1 day's work =            1/23       ;

                             

B's 1 day's work =            10/299  .

                             

(A + B)'s 1 day's work =  (1/23     +    10/299)   =     23/299               =             1/13       .

                                            

Therefore, A and B together can complete the work in 13 days.

 

 

18.  Ravi and Kumar are working on an assignment. Ravi takes 6 hours to type 32 pages on a computer, while Kumar takes 5 hours to type 40 pages. How much time will they take, working together on two different computers to type an assignment of 110 pages?

A. 7 hours 30 minutes

 

B. 8 hours

 

C. 8 hours 15 minutes

 

D. 8 hours 25 minutes

 

Answer: Option C

Explanation:

 

Number of pages typed by Ravi in 1 hour =           32/6       =             16/3       .

                             

Number of pages typed by Kumar in 1 hour =      40/5       = 8.

                             

Number of pages typed by both in 1 hour =       (16/3    + 8 )          =             40/3       .

                                            

  Time taken by both to type 110 pages =                      (110  x    3/40)          hours

                                                           

= 8   1/4               hours (or) 8 hours 15 minutes.

                             

 

 

19.  A, B and C can complete a piece of work in 24, 6 and 12 days respectively. Working together, they will complete the same work in:

A. 1/24  day

 

B. 7/24  day

              

C. 3   3/7              days

                             

D. 4 days

Answer: Option C

Explanation:

Formula: If A can do a piece of work in n days, then A's 1 day's work =      1/n         .

                             

(A + B + C)'s 1 day's work =           (1/24   +    1/6    +    1/12)   =    7/24         .

                                            

Formula: If A's 1 day's work =      1/n         ,  then A can finish the work in n days.

                                            

So, all the three together will complete the job in              24/7        days     =    3    3/7   days.

                                            

 

20. Sakshi can do a piece of work in 20 days. Tanya is 25% more efficient than Sakshi. The number of days taken by Tanya to do the same piece of work is:

A. 15

 

B. 16

 

C. 18

 

D. 25

 

Answer: Option B

Explanation:

 

Ratio of times taken by Sakshi and Tanya = 125 : 100 = 5 : 4.

Suppose Tanya takes x days to do the work.

5 : 4 :: 20 : x    

 x =   (4 x 20)/5  

                                            

  x = 16 days.

Hence, Tanya takes 16 days to complete the work.

 

 

21.  A takes twice as much time as B or thrice as much time as C to finish a piece of work. Working together, they can finish the work in 2 days. B can do the work alone in:

A. 4 days

 

B. 6 days

 

C. 8 days

 

D. 12 days

 

Answer: Option B

Explanation:

 

Suppose A, B and C take x,   x/2   and     x/3  days respectively to finish the work.

                             

Then,      (1/x  +  2/x   +   3/x )   =    1/2

                             

               6/x   =   1/2

              

  x = 12.

So, B takes   (12/2)   =  6 days to finish the work.

 

 

22.  A and B can complete a work in 15 days and 10 days respectively. They started doing the work together but after 2 days B had to leave and A alone completed the remaining work. The whole work was completed in :

A. 8 days

 

B. 10 days

 

C. 12 days

 

D. 15 days

 

Answer: Option C

Explanation:

 

(A + B)'s 1 day's work =  (1/15    +   1/10)               =  1/6   .

                                            

Work done by A and B in 2 days =             (1/6  x 2 )  =    1/3             .

                                            

Remaining work =            (1 -   1/3)    =    2/3          .

                                                           

Now,     1/15       work is done by A in 1 day.

                             

               2/3         work will be done by a in              15 x  2/3               = 10 days.

                                                                                                        

Hence, the total time taken = (10 + 2) = 12 days.

 

 

23.  A and B can do a piece of work in 30 days, while B and C can do the same work in 24 days and C and A in 20 days. They all work together for 10 days when B and C leave. How many days more will A take to finish the work?

A. 18 days

 

B. 24 days

 

C. 30 days

 

D. 36 days

 

Answer: Option A

Explanation:

 

2(A + B + C)'s 1 day's work =        (1/30    +   1/24   +   1/20)             =          15/120   =    1/8  .

                                            

Therefore, (A + B + C)'s 1 day's work =     1/(2x8)  =             1/16       .

                             

Work done by A, B, C in 10 days =             10/16    =             5/8         .

                             

Remaining work =            (1 -   5/8)            =  3/8   .

                                                           

A's 1 day's work =            (1/16    -    1/24)                  =     1/48           .

                                            

Now,     1/48       work is done by A in 1 day.

                             

So,         3/8         work will be done by A in             (48 x 3/8)       = 18 days.

                                                                                                        

 

 

 

24.  A works twice as fast as B. If B can complete a work in 12 days independently, the number of days in which A and B can together finish the work in :

A. 4 days

 

B. 6 days

 

C. 8 days

 

D. 18 days

 

Answer: Option A

Explanation:

 

Ratio of rates of working of A and B = 2 : 1.

So, ratio of times taken = 1 : 2.

B's 1 day's work =            1/12       .

                             

  A's 1 day's work =          1/6         ; (2 times of B's work)

                             

(A + B)'s 1 day's work =                (1/6  +   1/12)     =   3/12               =   1/4   .

                                            

So, A and B together can finish the work in 4 days.

 

 

25.  Twenty women can do a work in sixteen days. Sixteen men can complete the same work in fifteen days. What is the ratio between the capacity of a man and a woman?

A. 3 : 4

 

B. 4 : 3

 

C. 5 : 3

 

D. Data inadequate

 

Answer: Option B

Explanation:

 

(20 x 16) women can complete the work in 1 day.

  1 woman's 1 day's work =          1/320    .

                             

(16 x 15) men can complete the work in 1 day.

  1 man's 1 day's work = 1/240

              

So, required ratio             =             1/240    :              1/320

              

 

               =             1/3   :  1/4

              

                  = 4 : 3 (cross multiplied)

 

 

26.  A and B can do a work in 8 days, B and C can do the same work in 12 days. A, B and C together can finish it in 6 days. A and C together will do it in :

A. 4 days

 

B. 6 days

 

C. 8 days

 

D. 12 days

 

Answer: Option C

Explanation:

 

(A + B + C)'s 1 day's work =           1/6         ;

                             

(A + B)'s 1 day's work =  1/8         ;

                             

(B + C)'s 1 day's work =   1/12       .

                             

  (A + C)'s 1 day's work    =             (2 x   1/6 )    -    (1/8   + 1/12)       

                                                           

 

               =             1/3    -    5/24    

                                            

 

               =             3/24

              

 

               =             1/8         .

                             

 

So, A and C together will do the work in 8 days.

 

              

27.  A can finish a work in 24 days, B in 9 days and C in 12 days. B and C start the work but are forced to leave after 3 days. The remaining work was done by A in:

 A. 5 days

 

B. 6 days

 

C. 10 days

 

D. 10    1/2   days

                             

Answer: Option C

Explanation:

 

(B + C)'s 1 day's work =   (1/9   +    1/12)  =   7/36 .

                                            

Work done by B and C in 3 days =    (7/36   x 3 )  =   7/12.

                                            

Remaining work =            (1 -  7/12)     =  5/12        .

                                            

Now,     1/24       work is done by A in 1 day.

                             

So,         5/12       work is done by A in            (24 x   5/12)       = 10 days.

                                                                                                        

 

 

28.  X can do a piece of work in 40 days. He works at it for 8 days and then Y finished it in 16 days. How long will they together take to complete the work?

A. 13   1/3   days

                             

B. 15 days

 

C. 20 days

 

D. 26 days

 

Answer: Option A

Explanation:

 

Work done by X in 8 days =          (1/40   x 8)     =   1/5       .

                                                                                                        

Remaining work =              (1 -  1/5)              =   4/5 .

                                                           

Now,     4/5         work is done by Y in 16 days.

                             

Whole work will be done by Y in     (16 x  5/4)      = 20 days.

                                                                          

  X's 1 day's work =          1/40       , Y's 1 day's work =          1/20       .

                             

(X + Y)'s 1 day's work =      (1/40  +  1/20)   =  3/40              .

                                            

Hence, X and Y will together complete the work in              40/3    = 13   1/3             days.

                                            

 

 

29.  A and B can do a job together in 7 days. A is 1  times as efficient as B. The same job can be done by A alone in :

A. 9   1/3              days

                             

B. 11 days

 

C. 12   1/4   days

                             

D. 16    1/3   days

                             

 

Answer: Option B

Explanation:

 

(A's 1 day's work) : (B's 1 day's work) =   7/4   : 1   =   7 : 4.

              

Let A's and B's 1 day's work be 7x and 4x respectively.

Then, 7x + 4x =  1/7                  

                 11x =  1/7               

                      x =  1/77       .

                             

  A's 1 day's work =             (1/77   x 7)     =   1/11   .

              

 

30.  A and B together can do a piece of work in 30 days. A having worked for 16 days, B finishes the remaining work alone in 44 days. In how many days shall B finish the whole work alone?

A. 30 days

 

B. 40 days

 

C. 60 days

 

D. 70 days

 

Answer: Option C

Explanation:

 

Let A's 1 day's work = x and B's 1 day's work = y.

Then, x + y =   1/30          and 16x + 44y = 1.

                             

Solving these two equations, we get: x = 1/60       and y =  1/60

              

  B's 1 day's work =          1/60       .

              

Hence, B alone shall finish the whole work in 60 days.

 

 

31.  A and B together can complete a task in 7 days. B alone can do it in 20 days. What part of the work was carried out by A?

I.             A completed the job alone after A and B worked together for 5 days.

II.            Part of the work done by A could have been done by B and C together in 6 days.

 

A. I alone sufficient while II alone not sufficient to answer

 

B. II alone sufficient while I alone not sufficient to answer

 

C. Either I or II alone sufficient to answer

 

D. Both I and II are not sufficient to answer

 

E. Both I and II are necessary to answer

 

Answer: Option A

Explanation:

 

B's 1 day's work =            1/20

              

(A+ B)'s 1 day's work =   1/7

              

 I. (A + B)'s 5 day's work =             5/7

              

Remaining work =            (1 -  5/7)                =     2/7             .

                                            

               2/7         work was carried by A.

                             

II. is irrelevant.

  Correct answer is (A).

 

 

32.  How long will Machine Y, working alone, take to produce x candles?

I.             Machine X produces x candles in 5 minutes.

II.            Machine X and Machine Y working at the same time produce x candles in 2 minutes.

 

A. I alone sufficient while II alone not sufficient to answer

 

B. II alone sufficient while I alone not sufficient to answer

 

C. Either I or II alone sufficient to answer

 

D. Both I and II are not sufficient to answer

 

E. Both I and II are necessary to answer

 

Answer: Option E

Explanation:

 

 I. gives, Machine X produces       x/5         candles in 1 min.

                             

II. gives, Machine X and Y produce            x/2         candles in 1 min.

              

From I and II, Y produces               (x/2  -   x/5)     =     3x/10              candles in 1 min.

                                            

3x/10     candles are produced by Y in 1 min.

              

x candles will be produced by Y in             (10/3x  x     x)     min =    10/3       min.

                                            

Thus, I and II both are necessary to get the answer.

  Correct answer is (E).

 

 

 

33.  In how many days can 10 women finish a work?

I.             10 men can complete the work in 6 days.

II.            10 men and 10 women together can complete the work in 3        3/7         days

                             

III.          If 10 men work for 3 days and thereafter 10 women replace them, the remaining work in completed in 4 days.

 

A. Any two of the three

 

B. I and II only

 

C. II and III only

 

D. I and III only

 

E. None of these

 

Answer: Option A

Explanation:

 

  I. (10 x 6) men can complete the work in 1 day.

        1 man's 1 day's work =          1/60

              

 

 

 II.                        (10 x      24/7)     men +  (10 x     24/7)     women can complete the work in 1 day.

                                                                                                                                      

                              240/7    men's 1 day work +         240/7   women's 1 day work = 1.

                                                           

                              (240/7   x    1/60)   +      (240/7)    women's 1 day's work = 1.

                                                                                                                       

                              240/7    women's 1 day's work = (1   -   4/7)    =   3/7

                                                                                                        

        10 women's 1 day's work =     (3/7     x  7/240             x 10)      =   1/8

                             

      So, 10 women can finish the work in 8 days.

 

 

III. (10 men's work for 3 days) + (10 women's work for 4 days) = 1

        (10 x 3) men's 1 day's work + (10 x 4) women's 1 day's work = 1

        30 men's 1 day's work + 40 women's 1 day's work = 1

 

 

      Thus, I and III will give us the answer.

      And, II and III will give us the answer.

        Correct answer is (A).

 

 

34.  How many workers are required for completing the construction work in 10 days?

I.             20% of the work can be completed by 8 workers in 8 days.

II.            20 workers can complete the work in 16 days.

III.          One-eighth of the work can be completed by 8 workers in 5 days.

 

A. I only

 

B. II and III only

 

C. III only

 

D. I and III only

 

E. Any one of the three

 

Answer: Option E

Explanation:

 

  I.           20/100  work can be completed by (8 x 8) workers in 1 day.

              

    Whole work can be completed by (8 x 8 x 5) workers in 1 day.

        =     (8 x 8 x 5)/10    workers in 10 days = 32 workers in 10 days.

              

 

 

 II. (20 x 16) workers can finish it in 1 day.

               (20 x 16)/10        workers can finish it in 10 days.

              

    32 workers can finish it in 10 days.

 

III.          1/8   work can be completed by (8 x 5) workers in 1 day.

                             

    Whole work can be completed by (8 x 5 x 8) workers in 1 day.

        =     (8 x 5 x 8)/10    workers in 10 days = 32 workers in 10 days.

              

  Any one of the three gives the answer.

  Correct answer is (E).

 

 

 

35.  8 men and 14 women are working together in a field. After working for 3 days, 5 men and 8 women leave the work. How many more days will be required to complete the work?

I.             19 men and 12 women together can complete the work in 18 days.

II.            16 men can complete two-third of the work in 16 days.

 III.         In 1 day, the work done by three men in equal to the work done by four women.

 

A. I only

 

B. II only

 

C. III only

 

D. I or II or III

 

E. II or III only

 

Answer: Option D

Explanation:

 

Clearly, I only gives the answer.

Similarly, II only gives the answer.

And, III only gives the answer.

  Correct answer is (D).

 

 

36.   A and B complete a work in 6 days. A alone can do it in 10 days. If both together can do the work in how many days?

             A. 3.75 days

             B. 4 days

             C. 5 days

             D. 6 days

Answer & Explanation

Answer: Option A

Explanation:

1/6 + 1/10 = 8/30 = 4/15

15/4 = 3.75 days

 

 

37.  A and B together can do a piece of work in 8 days. If A alone can do the same work in 12 days, then B alone can do the same work in?

             A. 20 days

             B. 16 days

             C. 24 days

             D. 28 days

Answer & Explanation

Answer: Option C

Explanation:

B = 1/8 – 1/2 = 1/24 => 24 days

 

 

38.   A and B can do a piece of work in 6 2/3 days and 5 days respectively. They work together for 2 days and then A leaves. In how many days after that B will complete the work alone.

             A. 2 days

             B. 1 ½ days

             C. 3 days

             D. 3 ½ days

Answer & Explanation

Answer: Option B

Explanation:

3/20 * 2 + (2 + x)/5 = 1

x = 1 ½ days

 

 

39.  A can do a piece of work in 4 days. B can do it in 5 days. With the assistance of C they completed the work in 2 days. Find in how many days can C alone do it?

             A. 10 days

             B. 20 days

             C. 5 days

             D. 4 days

Answer & Explanation

Answer: Option B

Explanation:

C = 1/2 - 1/4 - 1/5 = 1/20 => 20 days

 

 

40.  A can do a piece of work in 30 days. He works at it for 5 days and then B finishes it in 20 days. In what time can A and B together it?

             A. 16 2/3 days

             B. 13 1/3 days

             C. 17 1/3 days

             D. 16 1/2 days

Answer & Explanation

Answer: Option B

Explanation:

5/30 + 20/x = 1

x = 24

1/30 + 1/24 = 3/40

40/3 = 13 1/3 days

 

 

41.  A and B can do a work in 5 days and 10 days respectively. A starts the work and B joins him after 2 days. In how many days can they complete the remaining work?

             A. 1 day

             B. 2 days

             C. 3 days

             D. 4 days

Answer & Explanation

Answer: Option B

Explanation:

Work done by A in 2 days = 2/5

Remaining work = 3/5

Work done by both A and B in one day = 1/5 + 1/10 = 3/10

Remaining work = 3/5 * 10/3 = 2 days.

 

 

42.  A, B and C can do a work in 6 days, 8 days and 12 days respectively. In how many days can all three of them working together, complete the work?

             A. 2 2/3 days

             B. 4 2/3 days

             C. 1 2/3 days

             D. 2 1/3 days

Answer & Explanation

Answer: Option A

Explanation:

Work done by all three of them in one day = 1/6 + 1/8 + 1/12 = 3/8.

The number of days required = 8/3 = 2 2/3 days.

 

 

43.   A, B and C can do a piece of work in 24 days, 30 days and 40 days respectively. They began the work together but C left 4 days before the completion of the work. In how many days was the work completed?

             A. 5 days

             B. 4 days

             C. 7 days

             D. 11 days

Answer & Explanation

Answer: Option D

Explanation:

One day work of A, B and C = 1/24 + 1/30 + 1/40 = 1/10 Work done by A and B together in the last 4 days = 4*(1/24 + 1/30) = 3/10

Remaining work = 7/10

The number of days required for this initial work = 7 days.

The total number of days required = 4 + 7 = 11 days.

 

 

44.  P is three times as fast as Q and working together, they can complete a work in 12 days. In how many days can Q alone complete the work?

             A. 16 days

             B. 20 days

             C. 17 days

             D. 12 days

Answer & Explanation

Answer: Option A

Explanation:

P = 3Q

P + Q = 3Q + Q = 4Q

These 4Q people can do the work in 12 days, which means Q can do the work in 48 days.

Hence, P can do the work in 16 days.

 

 

45.  If 5 men and 2 boys working together, can do four times as much work per hour as a man and a boy together. Find the ratio of the work done by a man and that of a boy for a given time?

             A. 1:3

             B. 3:1

             C. 1:2

             D. 2:1

Answer & Explanation

Answer: Option D

Explanation:

5M + 2B = 4(1M + 1B)

5M + 2B = 4M + 4B

1M = 2B

The required ratio of work done by a man and a boy = 2:1

 

 

46.  30 men can do a work in 40 days. When should 20 men leave the work so that the entire work is completed in 40 days after they leave the work?

             A. 5 days

             B. 10 days

             C. 15 days

             D. 20 days

Answer & Explanation

Answer: Option B

Explanation:

Total work to be done = 30 * 40 = 1200

Let 20 men leave the work after 'P' days, so that the remaining work is completed in 40 days after they leave the work.

40P + (20 * 40) = 1200

40P = 400 => P = 10 days

 

 

47.   A and B can do a work in 4 hours and 12 hours respectively. A starts the work at 6AM and they work alternately for one hour each. When will the work be completed?

             A. 4 days

             B. 7 days

             C. 5 days

             D. 6 days

Answer & Explanation

Answer: Option D

Explanation:

Work done by A and B in the first two hours, working alternately = First hour A + Second hour B = 1/4 + 1/12 = 1/3.

Total time required to complete the work = 2 * 3 = 6 days.

 

 

48.  A can do a work in 9 days and B can do the same work in 18 days. If they work together, in how many days will they complete the work?

             A. 8

             B. 7

             C. 6

             D. 5

             E. None of these.

Answer & Explanation

Answer: Option C

Explanation:

One day's work of A and B = 1/9 + 1/8 = (2+1)/18 = 1/6 So, the time taken to complete the work is 6 days.

 

 

49.   A, B and C can do a work in 90, 30 and 45 days respectively. If they work together, in how many days will they complete the work?

             A. 15

             B. 10

             C. 20

             D. 25

             E. None of these

Answer & Explanation

Answer: Option A

Explanation:

One days's work of A, B and C = 1/90 + 1/30 + 1/45

= (1 + 3 + 2)/90 = 1/15

A, B and C together can do the work in 15 days.

 

 

50. A does half as much work as B in three –fourth of the time if together they take 18 days to complete a work. How much time shall B take to do it?

             A. 30days

             B. 35 days

             C. 40 days

             D. None of these

Answer & Explanation

Answer: Option A

Explanation:

B takes x days to do the work

 

Therefore, A takes (2 × 3/4x)i.e.., 3x/2 days to do it

 

Now , (A +B)’s 1 day’s work = 1/18

 

Therefore, 1/x + 2/3x = 1/18 or x =30.

 

Comments